Agenda Objectives; Complete all surveys to finalize Adelphi's profile and budget based on current prices and prepare the deliverable for early next week. Infrastructure Assessment — Survey of existing structures, including the chicken coop, gazebos, and other elements, led by Architect Alexander Arias Lora. Electrical Systems Evaluation — Assessment of the current condition of the electrical pole by Engineer Edward Sepúlveda. — Identification of pump types and energy consumption requirements. — Survey of low-voltage electrical needs. Topographic Survey — Conduct a drone-based survey to produce orthophoto and contour lines, led by Surveyor Nolan Durán. LFG 🌱🌴🌲